Contact
(720)295-8006
tips@coloradoindependent.com
The Colorado Independent,2020
All Right Reserved.
Tag: boiler tubing
PUC weighs rate-increase refunds in light of Comanche 3 power plant...
Tests over the weekend on Xcel Energy’s new Comanche 3 coal-fired power plant revealed cracks in boiler tubing that will push the facility’s opening...